WADANGGARI PARK

WADANGGARI PARK

An innovative cranage solution for a challenging build.

SHARE

PROJECT OVERVIEW

When we talk about removing construction complexity by using the right crane solution, this is the kind of project we are talking about.

A bold initiative by Lane Cove Council, partially funded by the NSW Government’s Public Spaces Legacy Program, Wadanggari Park features 4,750sqm of open green space connecting the community to St Leonards train station, new retail, commercial and residential developments, with pedestrian links to the new Sydney Metro Crows Nest Station.

This transformative over-rail plaza is a triumph of urban design, but for the design engineers at Aurecon, it was a near-impossible construction challenge. Faced with the dilemma of how to build the project, Aurecon turned to Marr for a solution.

Client
Arenco (NSW)
Project
Wadanggari Park
Location
Sydney, Australia
Sector
LARGE-SCALE CONSTRUCTION
Date
July – October 2022
Cranes

1 x M2480D

THE CHALLENGE

Envisaging a precast construction methodology for the over-rail structure, Aurecon needed a cranage solution that would align their proposed methodology with the constraints of the site.

‘Congested’ is an understatement when it comes to describing the limited space available on this site.

Wedged between high-rise buildings, one of Australia’s busiest arterial roads and spanning a major rail corridor on Sydney’s northern train line, the site has an area of approximately seven metres wide in which to establish a crane capable of lifting precast elements weighing up to 150 tonnes, across a 95-metres-long by 30-metres-wide rail cutting.

With the construction program relying on restrictive night road closures and rail possessions, the challenge was to design a cranage solution capable of completing heavy lifting requirements safely and efficiently within these small windows of time. For Marr’s team, the key challenge was as much around installing and removing the crane, as it was about completing the required lifting for the project.

OUR SOLUTION

Working with Aurecon over 18 months we designed a solution which centred around one of our M2480D Heavy Lift Luffer tower cranes. Giving the engineers the confidence that their design concept could be constructed, our solution became part of the tender package for the build-phase of the project.

THE RESULT

After 18 months of planning, the result was a safe, efficient solution to what would have been an otherwise incredibly complicated task. Arenco were able to erect the girders, successfully navigating though the complex road closures and inflexible possessions.

The innovative solution has paved the way for alternative approaches to constructing structures and projects that have previously been deemed inaccessible to traditional construction methods.

LET'S TALK ABOUT HOW WE COULD ADD VALUE TO YOUR PROJECT

We work with our clients to find a craneage solution that works – no matter how big or complex the job is. If the right crane doesn’t already exist, we’ll build one to suit the needs of your project.

“The heavy lifting capacity of Marr’s M2480D tower crane provided an extremely efficient craneage solution that maximised the available time for construction works during the rail corridor shutdowns and ultimately delivered program benefits throughout the duration of the project.
To my knowledge this was the first time that a tower crane had been used on a bridge infrastructure project in this way and it was a resounding success.”

– Paul Fitzgerald, Senior Project Manager, Aurecon

The area available to establish a crane capable of lifting precast elements weighing up to 150 tonnes across a 95m x 30m-wide rail cutting was just 7m wide. By installing one of our M2480Ds on a bespoke compact piled foundation with a 64-metre boom, Marr’s solution provided our client, Arenco, with the unique combination of the M2480D’s heavy lifting capacity and small footprint (equivalent to two passenger cars parked side-by-side).

Once Arenco was appointed as Head Contractor, we worked with their team to develop the detailed designs and methodology for how the cranage solution would support their construction program, as well as how we would install and remove our crane in such a congested area.

Installing one of our M2480Ds on a bespoke compact piled foundation with a 64-metre boom provided Arenco with the unique combination of the M2480D’s heavy lifting capacity and small footprint (equivalent to two passenger cars parked side-by-side).

With the construction program relying on restrictive night road closures and rail possessions, the cranage solution had to be capable of completing heavy lifting requirements safely and efficiently within small windows of time.

With a lifting capacity of more than 60 tonnes over a 60-metre radius, the M2480D made light work of installing more than 40 precast beams each weighing up to 80-150 tonnes.

The cranage solution meant that Arenco’s project team could focus their attention on maximising the number of beams delivered to the waiting crane hook, (instead of the number of beams that the crane could install), during rail possessions and road closures.

“Numerous rescheduling requirements, due to the inclement weather and all sort of other humps imposed, were successfully sorted out thanks to Marr’s team and their professional approach throughout the process.”

– Zani Buzevski, Construction Manager, Arenco (NSW)

LET'S TALK ABOUT HOW WE COULD ADD VALUE TO YOUR PROJECT

We work with our clients to find a craneage solution that works – no matter how big or complex the job is. If the right crane doesn’t already exist, we’ll build one to suit the needs of your project.

ABOUT US

We’re not just a crew and cranes for hire. We’re big thinkers and problem solvers who love a challenge. No problem is too big for us.

OUR PHILOSOPHY

We believe that the crane needs to suit the job, not the other way around. We don’t just hire cranes – we design craneage solutions.

OUR HERITAGE

We’re a third-generation family-owned and run business with a strong sense of tradition and loyalty engrained in what we do and how we work together.

OUR PEOPLE

We think of our team as ‘one big family’ of problem-solvers who love cranes and the challenge of working on complex, large-scale projects.

OUR APPROACH

We work with you to find an engineering solution that works. Delivering value through the unique combination of our knowledge, experience, proven service delivery and people.

OUR SERVICES

We’ve worked on some of the most complex and challenging large-scale construction projects across Australia and around the world.

OUR CRANES

We don’t just hire cranes – we design them. So, if the right crane for your job doesn’t already exist, we’ll build one.

OUR PROJECTS

With almost 100 years’ experience, we have a reputation for taking on projects that others can’t or won’t.

SAFETY, QUALITY & ENVIRONMENT

We take on the jobs that many others can’t or won’t – but we always put good business practices first.

SUSTAINABILITY

We take sustainability seriously. It’s inherent in our commitment to finding the best and most efficient solution to every job.

SOCIAL IMPACT

As problem-solvers who love a challenge, we are never shy of tackling the big issues.

DIVERSITY

We are committed to creating a diverse, inclusive and flexible workplace that reflects the clients and communities we work with.